Surface decoration

PANOTECH system construction begins with a concrete floor. According to the construction of a steel bracket to mount.With concrete to mount on a steel base diameter of 6 mm PANOTECH Buried in the ground about 3 inches, and embedded in a sheet about 30 cm PANOTECH a lightweight. It can be cut easily to the specified format. Then the plate. The wall structure. Plate can be lifted to facilitate the construction unit. The material is low. And it can be difficult without it. The steel plates will be inserted between the plates DOWELBAR insulation to the wall with steel mesh along a steel clamp. Installed at the corners to make work easier. Plan must be braced to the vertical and strong enough to withstand the working conditions and strong winds. Bracing one side of each sheet first. Concrete can be stuffed to the other side. Sheet adjacent to the plate next to the steel mesh and 10 cm for a steel brace to stick together. By binding to the strong points on both sides. Or use the link or use the clip. Openings for doors and windows. With scissors, cut a small iron. To cut the wire and use a knife to cut the insulation off. The rest of cut openings must be strong enough. The corners of doors and windows should be added. Stainless steel 1 x 2 feet in 45-degree angle, then the frame. In order to increase the structural strength to the bond beam, and in some cases, made possible by the bond column. The insulation is removed. When the concrete is fully cast. It will act as beams and columns have been further reinforced. The bond beam and a strong bond column, it makes more PANOTECH sheet can be used as both columns, beams, walls, floors, roof ladder is a simple way.And building systems or a complete system which can be incorporated into the system PANOTECH it. Once installed, the PANOTECH into place and braced it. It can be equipped with various accessories include cable, water pipes. Telephone lines, etc. The devices are inserted between the insulation and steel mesh. The installation of certain equipment. May have to cut the insulation to provide enough space to install a power outlet, etc. The need to be added to all the Steel on the line to the vertical. Binds tightly to iron all the points. The binding of iron by hand or using a clip or clamp etc. Spraying or coating of concrete. Must make sure that the disc is in the vertical PANOTECH the scene and determined. And is braced tightly. Openings of any box or pipe has been sealed off to prevent the concrete obstruction. SHOTCRETE concrete spraying should start at the bottom of the plate and do the above. Nozzles must be perpendicular. The area sprayed. Concrete will be closed in two layers. The first floor is cement spores Land. The final layer of plaster until it is smooth. Be prepared to decorate the surface of your skin, such as tile or masonry materials with a smooth or rough surface. Depending on demand.